Egypt

Cairo’s Qasr El Nil Bridge to close for 15 hours on Friday for maintenance

The Cairo General Traffic Department will implement traffic diversions across the Qasr El Nil Bridge on Friday to complete maintenance work on the structure’s metallic expansion joints.

The operation will require a full closure of the bridge’s westbound carriageway—affecting traffic approaching from Tahrir Square—for the duration of the repairs.

Work will be scheduled to run for 15 hours — from 12:05 am until three pm — with the westbound lanes set to reopen fully to vehicular traffic immediately upon completion.

Alternative routes and traffic diversions

Under the traffic management plan, authorities will close the Tahrir Street approach leading onto the Qasr El Nil Bridge from Tahrir Square.

Motorists will be diverted around Tahrir Square onto Meret Basha Street, continuing to Abdel Moneim Riad Square to access the 6th of October Bridge ramp toward Giza, before exiting onto El Gezira Street.

Additionally, the on-ramp leading to the Qasr El Nil Bridge from the Kamal El-Din Salah Tunnel will be closed.

Traffic will instead be rerouted along the Nile Corniche toward Abdel Moneim Riad Square, connecting to the 6th of October Bridge toward Giza and exiting through the El Gezira Street off-ramp.

The Cairo General Traffic Department will deploy additional officers throughout the area in coordination with the executing contractors, while installing clear signage and safety barriers to alert motorists to the ongoing roadwork.

This aims to prevent congestion and maintain smooth traffic flow.

Edited translation from Al-Masry Al-Youm

Related Articles

Back to top button